Where the Trillion-Dollar AI Data Center Spend Is Going

Data center capital spending is expected to pass $1 trillion in 2026 and $3 trillion by 2030. Dell'Oro nearly doubled its 2030 outlook between January and August 2026, so every figure on this page carries its date. Here is where that money flows, and which part of it your product can compete for.[1][2]

Three ways to measure the market

Each figure on this page is tagged with what it measures. Mixing them is the most common mistake in AI infrastructure market sizing.

Operator spending

What hyperscalers, AI clouds, and operators invest in servers, networks, buildings, and equipment

Use it for

How much buying power an account has, and where it ranks

Supplier revenue

What vendors receive in a category such as optics, HBM, switches, liquid cooling, or power equipment

Use it for

The size of the market for a specific product

Cumulative investment

Modeled total investment in facilities, energy, and technology over several years

Use it for

The long-term opportunity, not a yearly market

Where the spending goes, layer by layer

These figures measure different things: yearly operator spending, supplier revenue, and multi-year investment. They show the size of each opportunity and overlap with one another, so they should never be added together.

All data center investment

Operator spending

Signal

More than $1 trillion in 2026, and more than $3 trillion by 2030[1][2]

What it covers

Servers, storage, networking, facilities, and supporting infrastructure, across clouds, AI clouds, telcos, and enterprises

What it means for you

The total customer wallet. It is not the market for any one product.

Server chips and components

Supplier revenue

Signal

$1.8 trillion by 2030[3]

What it covers

Accelerators, CPUs, memory, network cards, and storage drives

What it means for you

Compute sets the architecture and pulls demand through every layer around it.

High-bandwidth memory

Supplier revenue

Signal

$54.6 billion in 2026, up 58%[4]

What it covers

HBM stacks for GPUs and custom AI chips, not the wider DRAM or storage market

What it means for you

Memory is a major supplier market of its own, not only a GPU part.

AI back-end switches

Supplier revenue

Signal

About $1 trillion from 2026 to 2030 combined, with scale-up more than half by 2030[5]

What it covers

Scale-up and scale-out switches. This is not the same as optical module revenue.

What it means for you

A new networking cycle for switch silicon, systems, interconnect, and optics.

Datacom optical components

Supplier revenue

Signal

More than $19 billion in 2025, with over 42 million 400G and faster modules shipped[6]

What it covers

High-speed optical modules and components for data centers

What it means for you

A measurable photonics market that is growing now, with 1.6T modules ramping.

Power, cooling, and racks

Supplier revenue

Signal

$14 billion in the second quarter of 2026 alone, up 27%, and $120 billion by 2030[7][8]

What it covers

UPS, thermal management, power distribution, racks, and containment

What it means for you

A large market that sits next to photonics in the same build-out.

Liquid cooling

Supplier revenue

Signal

Close to $3 billion in 2025, approaching $7 billion by 2029[9]

What it covers

Direct-to-chip, two-phase, and immersion cooling

What it means for you

Designs are changing faster than incumbent equipment cycles, which opens the door to new suppliers.

AI data center buildings

Cumulative investment

Signal

About $800 billion through 2030 in McKinsey's 2025 model[10]

What it covers

Land, materials, construction, and site development

What it means for you

Equipment specified during facility design is sold to developers and builders, not server buyers.

Power, cooling, and connectivity investment

Cumulative investment

Signal

About $1.3 trillion through 2030 in McKinsey's 2025 model[10]

What it covers

Generation, transmission, electrical equipment, cooling, and connectivity. Overlaps the rows above.

What it means for you

Suppliers need utility, engineering firm, and developer relationships, not only hyperscaler IT contacts.

Electricity

Electricity use

Signal

About 485 TWh in 2025, roughly doubling to about 945 TWh by 2030[11]

What it covers

Electricity that data centers consume, not equipment revenue

What it means for you

Why access to power and time to energize now carry a price.

A few buyers hold most of the wallet

Five companies reported $586.3B of cash capital spending over their latest four quarters, through June 30, 2026 (Oracle: August 31, 2026), from SEC filings as of October 16, 2026. These are company-wide figures, broader than AI or data centers, and they leave out some leased capacity.[12]

See all 377 companies on the leaderboard
Cash capital spending over the latest four reported quarters
CompanyFour quarters
Amazon$173.0B
Google$132.4B
Microsoft$115.9B
Meta$89.3B
Oracle$75.7B

What the largest buyers say about 2026

Alphabet

Guided to $195 billion to $205 billion of 2026 capital spending after spending $44.9 billion in the second quarter. About 60% of its technical infrastructure spend that quarter went to servers and 40% to data centers and networking.[13][14]

One of the clearest public views of how spending splits between IT equipment and buildings.

Meta

Expects $135 billion to $145 billion of 2026 capital spending, narrowed in October from $130 billion to $145 billion.[15]

Spending across compute, custom silicon, networking, optics, power, and facilities.

Microsoft

Spent $41 billion in its fiscal fourth quarter of 2026, including finance leases. Roughly two-thirds went to short-lived assets, mainly CPUs and GPUs.[16]

Shows how much hyperscaler spending goes straight to compute, with the rest in long-lived sites.

Amazon

Guided to about $220 billion of 2026 cash capital spending, raised from about $200 billion, citing memory costs.[17]

This is all of Amazon, not AWS AI spending alone. Size an AWS opportunity separately.

Oracle

About $75.7 billion of cash capital spending over its latest four reported quarters.[12]

A large buyer beyond the four biggest clouds.

Who matters in each layer

The ecosystem is not a list of AI companies. It is a network of companies that set requirements, supply parts, build systems, qualify products, and operate capacity. Supplier names come from the companies the Prospectory leaderboard tracks.

Compute

NVIDIA and AMD set the merchant accelerator roadmap, alongside custom chips from the hyperscalers, such as AWS Trainium.

Optics, cooling, networking, and power suppliers sell against requirements the accelerator roadmap creates, even when the chip maker never writes the purchase order.

Memory and packaging

SK hynix, Samsung, and Micron supply HBM. The wider market runs through DRAM, modules, flash, advanced packaging, substrates, and test.

A CXL or memory pooling product has to show better accelerator use, less stranded memory, or a lower cost per answer, at a latency the workload accepts.

Interconnect and photonics

Established optical and networking vendors, plus emerging optical I/O companies the leaderboard tracks, such as Lightmatter, Ayar Labs, Avicena, Point2, Eliyan, Quintessent, HyperLight, and AttoTude.

Excellent technology still fails if it approaches the operator at the wrong point in the supply chain.

Power

Bloom Energy, Delta, Fluence, ABB, Cummins, GE Vernova, Hitachi Energy, and newer generation companies such as Oklo, X-energy, and Kairos.

Time to power is now a constraint on how fast capacity can be built.

Cooling

JetCool, Accelsius, CoolIT, Motivair, Submer, Johnson Controls, Carrier, Modine, Trane, and Auras.

The win depends on fitting the next compute platform and the facility design, not only on cooling performance.

Facilities, developers, and AI clouds

CoreWeave, Crusoe, Fluidstack, Lambda, Aligned, CyrusOne, Equinix, Core Scientific, Cipher, and Galaxy.

A first customer does not have to be a hyperscaler. An AI cloud or developer can give you the reference deployment that opens hyperscaler doors.

Enablers

Cadence, Keysight, Viavi, Anritsu, Applied Materials, and Jabil, across design software, test, materials, and manufacturing.

Design tools, contract manufacturing, and test often decide whether a promising product becomes a qualified, volume product.

From hundreds of companies to the accounts worth pursuing

A photonics or cooling supplier can look at a universe of hundreds of targets. We narrow it with questions like these, then check which signals point to a real buying window.

  • Which operators are increasing capital spending?
  • Which switch and accelerator vendors are building the architectures your product needs?
  • Which companies are hiring the engineers who would evaluate it?
  • Which competitors just raised money?
  • Which organizations are active in the standards that matter to you?

Frequently Asked Questions

Dell'Oro Group expects worldwide data center capital spending to pass $1 trillion in 2026 and $3 trillion by 2030. That is what operators spend. Supplier markets inside it are smaller and measured differently, for example $54.6 billion for HBM in 2026 and more than $19 billion for datacom optical components in 2025.

No. Operator spending, supplier revenue, and multi-year investment overlap. A switch sold to a hyperscaler is counted in its capital spending and in the switch market. Use each figure for the question it answers.

No. Reported capital spending covers the whole company, including retail and logistics, and is broader than AI. Size an AWS opportunity from the programs and architectures your product serves.

References

Figures checked against these sources on October 22, 2026.

  1. [1] AI infrastructure buildouts and memory cost inflation drove data center capex higher in 1Q 2026 (Dell'Oro Group, June 2026). https://www.delloro.com/news/ai-infrastructure-buildouts-and-memory-cost-inflation-drove-data-center-capex-higher-in-1q-2026/
  2. [2] AI buildout maintains momentum as data center capex surpasses $3 trillion by 2030 (Dell'Oro Group, August 2026). https://www.delloro.com/news/ai-buildout-maintains-momentum-as-data-center-capex-surpasses-3-trillion-by-2030/
  3. [3] Data center IT semiconductors and components market to surpass $1.8 trillion over next five years (Dell'Oro Group, August 2026). https://www.delloro.com/news/data-center-it-semiconductors-and-components-market-to-surpass-1-8-trillion-over-next-five-years/
  4. [4] 2026 market outlook: focus on the HBM-led memory supercycle, citing a BofA estimate (SK hynix Newsroom, January 2026). https://news.skhynix.com/en/2026-market-outlook-focus-on-the-hbm-led-memory-supercycle/
  5. [5] AI back-end switch sales to approach $1 trillion over the next five years (Dell'Oro Group, July 2026). https://www.delloro.com/news/ai-back-end-switch-sales-to-approach-1-trillion-over-the-next-five-years/
  6. [6] Datacom optical component revenue surpasses $19B in 2025 (Cignal AI, April 2026). https://cignal.ai/2026/04/datacom-optical-component-revenue-surpasses-19b-in-2025/
  7. [7] Data center physical infrastructure market grows 27 percent to $14 billion in 2Q 2026 (Dell'Oro Group, October 2026). https://www.delloro.com/news/data-center-physical-infrastructure-market-grows-27-percent-y-y-to-14-billion-in-2q-2026/
  8. [8] Data center physical infrastructure market forecast to reach $120 billion by 2030 (Dell'Oro Group, August 2026). https://www.delloro.com/news/data-center-physical-infrastructure-market-forecast-to-reach-120-billion-by-2030/
  9. [9] Data center liquid cooling market to approach $7 billion by 2029 as AI deployments accelerate (Dell'Oro Group, January 2026). https://www.delloro.com/news/data-center-liquid-cooling-market-to-approach-7-billion-by-2029-as-ai-deployments-accelerate/
  10. [10] McKinsey estimate of $6.7 trillion in data center investment by 2030, as reported by DatacenterDynamics (April 2025). https://www.datacenterdynamics.com/en/news/ai-could-drive-67-trillion-investment-in-data-centers-maybe-claims-mckinsey
  11. [11] How much energy do data centers and AI use? Our World in Data, citing IEA Key Questions on Energy and AI (2026). https://ourworldindata.org/how-much-energy-do-data-centers-and-artificial-intelligence-use
  12. [12] AI Infrastructure Leaderboard (Prospectory, sources dated October 16, 2026). https://prospectory.ai/ai-infrastructure-leaderboard/
  13. [13] AI infrastructure demand pushes Alphabet's 2026 capex guidance to $205 billion (W.Media, July 2026). https://w.media/ai-infrastructure-demand-pushes-alphabets-2026-capex-guidance-to-us-205-billion/
  14. [14] Alphabet second quarter 2026 results, Form 8-K exhibit 99.1 (SEC filing, July 2026). https://www.sec.gov/Archives/edgar/data/0001652044/000165204426000066/googexhibit991q22026.htm
  15. [15] Meta reports third quarter 2026 results (Meta Investor Relations, October 2026). https://investor.atmeta.com/investor-news/press-release-details/2026/Meta-Reports-Third-Quarter-2026-Results/default.aspx
  16. [16] Microsoft fiscal 2026 fourth quarter earnings call transcript (The Motley Fool, July 2026). https://www.fool.com/earnings/call-transcripts/2026/08/07/microsoft-msft-q4-2026-earnings-call-transcript/
  17. [17] Amazon second quarter 2026 earnings call transcript (Stock Analysis, July 2026). https://stockanalysis.com/stocks/amzn/transcripts/657334-q2-2026/

How large is your real market?

Bring one product. We size the part of the build-out it can win, by account and architecture generation.